WELL · 42-007-30916 · DISTRICT 4
St. Charles Co. #90
Aransas County · St. Charles (B-1) field · Shut IN · Directional
ST. Charles CO. #90 (API 42-007-30916) is a well in Aransas County operated by Hilcorp Energy Company, completed June 13, 2017 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 25, 2013, permitted to 9,480 ft.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.
Its lease has reported 36.2K barrels of oil and 62.6K mcf of gas since July 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Jul 2022 |
| Latest permit | Hilcorp Energy CompanyApr 25, 2013 |
- 9,480
- total depth, ft
- 1
- permits on file
- Apr 25, 2013
- last permit issued
- Jun 13, 2017
- completed
- 36.2K
- cumulative oil, bbl
- 62.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 13, 2017
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| St. Charles Co. O-4-13798 | St. Charles (B-1) | Hilcorp Energy Company | 2 | 36.2K | 62.6K | Jul 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hilcorp Energy CompanyJul 2013 → Jul 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 761314-99 | Drill | Hilcorp Energy Company | Apr 23, 2013 | Apr 25, 2013 | Jun 7, 2013 | 9,480 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-13798 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 13 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 6,070 | -6,057 |
| Anahuac | 6,490 | -6,477 |
| Frio | 7,724 | -7,711 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,040 | 8,048 | Perforated |
| 8,090 | 8,095 | Perforated |
| 8,266 | 8,272 | Perforated |
| 8,272 | 8,278 | Perforated |
| 8,272 | 8,292 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,980 | 12.25 | 1,310 S |
| 5.5 | 9,439 | 8.5 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 5, 2017 | Jul 21, 2017 | — |
| 00 | Jul 21, 2014 | May 23, 2014 | — |
| 00 | Mar 29, 2014 | Mar 7, 2014 | — |
| 00 | Feb 1, 2014 | Jul 11, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-007-30916 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-007-30916 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00730916, documented in the API reference.