WELL · 42-009-30443 · DISTRICT 9

Aminex Moch #1

N

Archer County  · Vertical

Aminex Moch #1 (API 42-009-30443) is a permitted well in Archer County filed by Crutcher & O'Donohoe; no completion report is on file yet.

The RRC has issued one drilling permit, issued August 2, 1984, permitted to 1,508 ft.

Completion filings report 2 formation tops, including Gunsite Lime, Gunsite Sd.

Operator of record

Crutcher & O'Donohoe

Wichita Falls, TX · P-5 Y, filed Dec 3, 1991 · 118 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCrutcher & O'DonohoeAug 2, 1984
1,508
total depth, ft
1
permits on file
Aug 2, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247084-99OtherCrutcher & O'DonohoeJul 30, 1984Aug 2, 1984—1,508

Formation tops

As filed on W-2/G-1. Subsea from 1,018 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsite Lime1,461-443
Gunsite SD1,469-451

Perforations

Perforated and open-hole intervals.

FromToType
1,4691,480Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,5107.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 9, 1971—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00930443, documented in the API reference.