WELL · 42-009-35332 · DISTRICT 9

McGlothin #5

Y

Archer County · Archer County Regular field · Shut IN  · Vertical

Mcglothin #5 (API 42-009-35332) is a well in Archer County operated by Sbg Resources Group LLC, completed December 26, 1981 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 24, 1981, permitted to 5,000 ft.

It was permitted by CA-Tex Petroleum, Inc. and has since transferred to Sbg Resources Group LLC on the wellbore schedule.

Completion filings report one formation top, including Caddo.

Its lease has reported 37.3K barrels of oil and 35 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

SBG Resources Group LLC

Permitted by CA-Tex Petroleum, Inc.; the EWA schedule now lists a different operator.

Frisco, TX · P-5 Y, filed Mar 4, 2026 · (214) 497-1897

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSBG Resources Group LLC
Production reportsSBG Resources Group LLCthrough Apr 2026
Latest permitCA-Tex Petroleum, Inc.Jun 24, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Jun 24, 1981
last permit issued
Dec 26, 1981
completed
37.3K
cumulative oil, bbl
35
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 26, 1981
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McGlothin O-13-19007Archer County RegularSBG Resources Group LLC537.3K35Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 709 · prior 12 709(+0%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sunday CorporationJan 1993 → Aug 1996
  2. 2T-N-T Engineering, Inc.Sep 1996 → Jun 2016
  3. 3Avad Operating, LLCJul 2016 → May 2019
  4. 4Daylight Petroleum LLCAug 2019 → Mar 2026
  5. 5SBG Resources Group LLCApr 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
122540-99DrillCA-Tex Petroleum, Inc.Jun 24, 1981Jun 24, 1981Jun 10, 19815,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19007————

Formation tops

As filed on W-2/G-1. Subsea from 1,092 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,478-3,386

Perforations

Perforated and open-hole intervals.

FromToType
4,5924,604Perforated
4,6124,616Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62578912.25350 sx
4.54,7647.875165 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1984Apr 9, 1984—
00May 10, 1984Apr 9, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

19.3K
bbl, last 12 reported months
19.3K
bbl, all reported
Dec 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082387H-1 InjectionCanceled Dec 31, 19961005004,592–4,604

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 19,275

01K2K3K1995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00935332, documented in the API reference.