WELL · 42-009-37364 · DISTRICT 9

Bratt #8

Y

Archer County · Archer County Regular field · Injection  · Vertical

Bratt #8 (API 42-009-37364) is a well in Archer County operated by Wilson Operating CO., completed July 29, 1993 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 2, 1983, permitted to 1,500 ft.

It was permitted by Gho-Mor Drilling Company and has since transferred to Wilson Operating CO. on the wellbore schedule.

Completion filings report one formation top, including Thomas Sand.

Its lease has reported 44.8K barrels of oil and 247 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 17.2K barrels injected in the 12 months reported through December 2025.

Operator of record

Wilson Operating Co.

Permitted by Gho-Mor Drilling Company; the EWA schedule now lists a different operator.

Archer City, TX · P-5 Y, filed Jan 5, 2026 · 64 permits on file · (940) 733-6140

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilson Operating Co.
Production reportsWilson Operating Co.through Apr 2026
Latest permitGho-Mor Drilling CompanyAug 2, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Aug 2, 1983
last permit issued
Jul 29, 1993
completed
44.8K
cumulative oil, bbl
247
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 29, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bratt O-13-20725Archer County RegularWilson Operating Co.844.8K247Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,006 · prior 12 760(+32%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wilson Operating Co.Jan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
203797-99DrillGho-Mor Drilling CompanyAug 2, 1983Aug 2, 1983Sep 24, 19831,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-20725————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Thomas Sand1,124

Perforations

Perforated and open-hole intervals.

FromToType
1,1241,126Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2006.25225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 9, 1993Aug 25, 1993—
00Jun 18, 1993May 24, 1993Yes
00Jun 1, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

17.2K
bbl, last 12 reported months
1.09M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079267H-1 InjectionActive5005001,124–1,126

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 17,176 · prior 12 17,421(-1%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00937364, documented in the API reference.