WELL · 42-009-38198 · DISTRICT 9
Garvey C. K. H #4H
Archer County · Archer County Regular field · Vertical
Garvey C. K. H #4H (API 42-009-38198) is a plugged well in Archer County, plugged March 15, 1993, last operated by Sunday Corporation.
The RRC has issued one drilling permit, issued March 23, 1984, permitted to 2,000 ft.
It was permitted by Psc Operations, Inc. and has since transferred to Sunday Corporation on the wellbore schedule.
Its lease has reported 168 barrels of oil and 3 mcf of gas since January 1993, last reporting in July 1993. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by PSC Operations, Inc.; the EWA schedule now lists a different operator.
Olney, TX · P-5 Y, filed Apr 6, 2018 · 96 permits on file · (940) 564-0339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sunday Corporation |
| Production reports | Sunday Corporationthrough Mar 1993 |
| Latest permit | PSC Operations, Inc.Mar 23, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Mar 23, 1984
- last permit issued
- Apr 23, 1984
- completed
- 168
- cumulative oil, bbl
- 3
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 1984
- Shut in
- —
- Plugged
- Mar 15, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garvey, C. K. "H" O-13-21340 | Archer County Regular | Sunday Corporation | 2 | 168 | 3 | Jan 1993 – Jul 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sunday CorporationJan 1993 → Mar 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 233335-99 | Drill | PSC Operations, Inc. | Mar 12, 1984 | Mar 23, 1984 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-21340 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,822 | 1,825 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,885 | 7.875 | 423 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 1986 | Mar 6, 1986 | — |
| 00 | Dec 5, 1984 | Nov 9, 1984 | — |
| 00 | Nov 22, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-38198 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-38198 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 25.5K
- bbl, last 12 reported months
- 76.7K
- bbl, all reported
- Oct 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000054570 | W-14 Disposal | Plugged May 3, 1993 | 120 | 600 | 1,822–1,825 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 25,540 · prior 12 25,620(0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00938198, documented in the API reference.