WELL · 42-009-38424 · DISTRICT 9

Campbell C #2C

Y

Archer County · Shanks (Thomas Sand) field · Injection  · Vertical

Campbell C #2C (API 42-009-38424) is a well in Archer County operated by Hays & Croker Partnership, completed October 4, 1984 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 31, 1984, permitted to 1,500 ft.

It was permitted by Shanks, Bob and has since transferred to Hays & Croker Partnership on the wellbore schedule.

Completion filings report 2 formation tops, including Thomas Sand, Gunsight.

Its lease has reported 19.8K barrels of oil and 134 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 9.5K barrels injected in the 12 months reported through January 2026.

Operator of record

Hays & Croker Partnership

Permitted by Shanks, Bob; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Oct 4, 2025 · 26 permits on file · (940) 564-3282

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHays & Croker Partnership
Production reportsHays & Croker Partnershipthrough Apr 2026
Latest permitShanks, BobJul 31, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
2
permits on file
Jul 31, 1984
last permit issued
Oct 4, 1984
completed
19.8K
cumulative oil, bbl
134
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 4, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell C O-13-24793Shanks (Thomas Sand)Hays & Croker Partnership519.8K134Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 217 · prior 12 285(-24%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Indy Oil, Inc.Jan 1993 → Feb 2004
  2. 2Pobres IncorporatedMar 2004 → May 2004
  3. 3Hays & Croker PartnershipJun 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
246963-98DrillShanks, BobApr 21, 1987Jul 31, 1984—1,424
246963-99DrillShanks, BobJul 31, 1984Jul 31, 1984Sep 4, 19841,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-24793————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Thomas SandTHOMAS1,069
Gunsight1,390

Perforations

Perforated and open-hole intervals.

FromToType
1,0701,075Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4207.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 1987Apr 17, 1987—
00May 2, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.5K
bbl, last 12 reported months
708K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000055926H-1 InjectionActive803501,070–1,075

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,500 · prior 12 10,000(-5%)

05001K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00938424, documented in the API reference.