WELL · 42-009-38503 · DISTRICT 9
Cone #1
Archer County · Megargel (Caddo) field · Vertical
Cone #1 (API 42-009-38503) is a plugged well in Archer County, plugged January 29, 1998, last operated by Sky Development Corporation.
The RRC has issued one drilling permit, issued July 19, 1984, permitted to 5,500 ft.
It was permitted by Dominion Petroleum Company and has since transferred to Sky Development Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Its lease has reported 4.53K barrels of oil and 20 mcf of gas since January 1993, last reporting in February 1998. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Dominion Petroleum Company; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 2, 2003 · 25 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sky Development Corporation |
| Production reports | Sky Development Corporationthrough Nov 1997 |
| Latest permit | Dominion Petroleum CompanyJul 19, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- Jul 19, 1984
- last permit issued
- Jul 21, 1985
- completed
- 4.53K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 21, 1985
- Shut in
- —
- Plugged
- Jan 29, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cone O-13-25499 | Megargel (Caddo) | Sky Development Corporation | 2 | 4.53K | 20 | Jan 1993 – Feb 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sky Development CorporationJan 1993 → Nov 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 245678-99 | Drill | Dominion Petroleum Company | Jul 19, 1984 | Jul 19, 1984 | — | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25499 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| CaddoCADDO LIME | 4,618 |
| Mississippian | 5,156 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,626 | 4,632 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 125 | 12.25 | 85 S |
| 4.5 | 5,491 | 7.875 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 28, 1985 | Aug 1, 1985 | — |
| 00 | Aug 13, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-38503 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-38503 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00938503, documented in the API reference.