WELL · 42-009-38550 · DISTRICT 9
Abercrombie-Taylor #3W
Archer County · Vertical
Abercrombie-Taylor #3W (API 42-009-38550) is a former disposal or injection well in Archer County, last operated by JL&M Energy, LLC; its UIC permits are no longer active.
The RRC has issued 2 drilling permits between 1984 and 2010, permitted to 1,500 ft.
Completion filings report 5 formation tops, including Thomas Sand, Megargel Sand, Megargel Sd., Gunsite Sand.
Operator of record
Wichita Falls, TX · P-5 Y, filed Jul 4, 2026 · 50 permits on file · (940) 872-0093
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Jl&m Energy, LLCDec 2, 2010 |
- 1,500
- total depth, ft
- 2
- permits on file
- Dec 2, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Abercrombie "C" O-13-24804 | Archer County Regular | Wichita Star Petroleum, Inc. | 3 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705772-99 | Reenter | Jl&m Energy, LLC | Nov 19, 2010 | Dec 2, 2010 | — | 1,500 |
| 253498-99 | Drill | Knight Petroleum Resources, Inc. | Oct 3, 1984 | Oct 3, 1984 | — | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24804 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,112 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas Sand | 1,153 | -41 |
| Thomas SandTHOMAS SD. | 1,153 | -41 |
| Megargel Sand | 1,281 | -169 |
| Megargel Sd. | 1,281 | -169 |
| Gunsite Sand | 1,395 | -283 |
| Gunsite Sd. | 1,395 | -283 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,395 | 1,406 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,434 | 7.875 | 320 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 24, 1987 | Feb 20, 1987 | — |
| 00 | Apr 18, 1986 | Apr 2, 1986 | Yes |
| 00 | Apr 13, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-38550 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-38550 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Dec 2011
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000061667 | H-1 Injection | Plugged Mar 21, 1997 | 0 | 0 | 1,395–0 |
| 000102853 | H-1 Injection | Canceled May 17, 2012 | 250 | 690 | 1,395–1,470 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00938550, documented in the API reference.