WELL · 42-009-38716 · DISTRICT 9
Farmer #2
Archer County · Cascade (Mississippian) field · Vertical
Farmer #2 (API 42-009-38716) is a plugged well in Archer County, plugged January 25, 1996, last operated by Rogers Drilling CO..
The RRC has issued 2 drilling permits between 1984 and 1989, permitted to 5,500 ft.
Completion filings report 5 formation tops, including Gunsite, Palo Pinto, Smithwick, Caddo.
Its lease has reported 1.89K barrels of oil and 21 mcf of gas since January 1993, last reporting in March 1996. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Olney, TX · P-5 Y, filed Jul 6, 2012 · 437 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rogers Drilling Co. |
| Production reports | Rogers Drilling Co.through Jan 1996 |
| Latest permit | Rogers Drilling Co.Mar 10, 1989 |
- 5,500
- total depth, ft
- 2
- permits on file
- Mar 10, 1989
- last permit issued
- Apr 17, 1985
- completed
- 1.89K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1985
- Shut in
- —
- Plugged
- Jan 25, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Farmer-Perkins O-13-26846 | Archer County Regular | Rogers Drilling Co. | 2 | 1.89K | 21 | Jan 1993 – Mar 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rogers Drilling Co.Jan 1993 → Jan 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 356718-99 | Recompletion | Rogers Drilling Co. | Mar 6, 1989 | Mar 10, 1989 | — | 5,120 |
| 262558-99 | Drill | Atoll Oil & Gas, Inc. | Apr 22, 1985 | Dec 28, 1984 | — | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26846 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,126 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gunsite | 1,214 | -88 |
| Palo Pinto | 3,142 | -2,016 |
| Palo PintoPALO PINTO LIME | 3,142 | -2,016 |
| Smithwick | 4,720 | -3,594 |
| Caddo | 4,785 | -3,659 |
| MississippianMISSISSIPPI | 5,156 | -4,030 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,786 | 4,798 | Perforated |
| 5,157 | 5,170 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 105 | 12.25 | 100 S |
| 4.5 | 5,190 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1989 | Mar 20, 1989 | — |
| 00 | Mar 30, 1989 | — | — |
| 00 | May 9, 1985 | Apr 22, 1985 | — |
| 00 | May 1, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-38716 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-38716 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.