WELL · 42-009-38797 · DISTRICT 9

Hillje North 40 #1

Plugged

Archer County · Archer County Regular field  · Vertical

Hillje North 40 #1 (API 42-009-38797) is a plugged well in Archer County, plugged September 26, 2003, last operated by Thompson Mark P..

The RRC has issued one drilling permit, issued March 4, 1985, permitted to 2,000 ft.

It was permitted by Roye Operating Company and has since transferred to Thompson Mark P. on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its 2 leases have reported 1.41K barrels of oil and 33 mcf of gas since January 1993, last reporting in October 2003. The leases carry 40 wells, so these are lease totals, not this well alone.

Operator of record

Thompson Mark P.

Permitted by Roye Operating Company; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Feb 4, 2005

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThompson Mark P.
Production reportsLegacy Petroleum Corporationthrough Jan 2002
Latest permitRoye Operating CompanyMar 4, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Mar 4, 1985
last permit issued
Mar 4, 1985
completed
1.41K
cumulative oil, bbl
33
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1985
Shut in
—
Plugged
Sep 26, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 40 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hillje O-13-25020Archer County RegularLegacy Petroleum Corporation341.11K14Jan 1993 – Oct 2003
Hillje North 40 O-13-25152Archer County RegularThompson, Mark P.629219Jan 1993 – Aug 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Expro Engineering, Inc.Jan 1993 → Nov 1994
  2. 22 T ProductionMar 1995 → Feb 1997
  3. 3Legacy Petroleum CorporationApr 2000 → Jan 2002
  4. 4Thompson, Mark P.Apr 2000 → May 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
268426-99DrillRoye Operating CompanyMar 1, 1985Mar 4, 1985—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25020————
—— O-13-25152————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
GunsightGUNSIGHT SAND1,380

Perforations

Perforated and open-hole intervals.

FromToType
1,3801,390Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4407.875230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 25, 2000May 22, 2000—
00Jun 8, 2000Mar 14, 1985—
00Apr 4, 1985Mar 14, 1985—
00Mar 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
9.26K
bbl, all reported
Dec 2003
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000062785H-1 InjectionPlugged Oct 14, 20031756501,380–1,390

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 1,200(-100%)

05010020022003

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00938797, documented in the API reference.