WELL · 42-009-39440 · DISTRICT 9

Oliver #40

Plugged

Archer County · Archer County Regular field  · Vertical

Oliver #40 (API 42-009-39440) is a plugged well in Archer County, plugged April 25, 2013, last operated by Postpeak LLC.

The RRC has issued one drilling permit, issued January 9, 1986, permitted to 700 ft.

It was permitted by Caravelle Inc. and has since transferred to Postpeak LLC on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 20K barrels of oil and 516 mcf of gas since January 1993, last reporting in July 2026. The lease carries 33 wells, so these are lease totals, not this well alone.

Operator of record

Postpeak LLC

Permitted by Caravelle Inc.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Feb 7, 2020 · 3 permits on file · (903) 505-9988

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePostpeak LLC
Production reportsPostpeak, LLCthrough May 2017
Latest permitCaravelle Inc.Jan 9, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

700
total depth, ft
1
permits on file
Jan 9, 1986
last permit issued
—
completed
20K
cumulative oil, bbl
516
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 25, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 33 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oliver O-13-25655Archer County RegularPostpeak, LLC3320K516Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oliver BrothersJan 1993 → Sep 1993
  2. 2Bluebonnet Land & Cattle Co.Nov 1993 → Aug 2005
  3. 3Energy Group of America, Inc.Sep 2005 → Jul 2007
  4. 4Brahman Operating, L.L.C.Aug 2007 → Jul 2009
  5. 5Stagg Investment Group, Inc.Aug 2009 → Oct 2011
  6. 6Postpeak, LLCNov 2011 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
294836-99DrillCaravelle Inc.Nov 27, 1985Jan 9, 1986Dec 1, 1986700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25655————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight550

Perforations

Perforated and open-hole intervals.

FromToType
572584Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.56606.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 2002Dec 14, 2001Yes
00Dec 28, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00939440, documented in the API reference.