WELL · 42-009-39529 · DISTRICT 9

McKinney Cowan 50 #1

Y

Archer County · Archer County Regular field · Injection  · Vertical

Mckinney Cowan 50 #1 (API 42-009-39529) is a well in Archer County operated by Wade Jim, completed September 1, 1986 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 31, 1986, permitted to 1,400 ft.

It was permitted by Multiplex Energy, Inc. and has since transferred to Wade Jim on the wellbore schedule.

Its lease has reported 9.81K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 9.15K barrels injected in the 12 months reported through December 2025.

Operator of record

Wade Jim

Permitted by Multiplex Energy, Inc.; the EWA schedule now lists a different operator.

Olney, TX · P-5 Y, filed Sep 4, 2025 · 19 permits on file · (940) 733-4184

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWade Jim
Production reportsWade, Jimthrough Apr 2026
Latest permitMultiplex Energy, Inc.Mar 31, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
1
permits on file
Mar 31, 1986
last permit issued
Sep 1, 1986
completed
9.81K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 1, 1986
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McKinney, Cowan 50 O-13-25917Archer County RegularWade, Jim49.81K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 85 · prior 12 30(+183%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kendrick, Paul W.Jan 1993 → Jul 1998
  2. 2Wade, JimApr 1999 → Apr 2026
  3. 3Hardrock Operating Company, Inc.Mar 2005 → Mar 2007
  4. 4Kem Energy, Inc.May 2022 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300452-99DrillMultiplex Energy, Inc.Mar 31, 1986Mar 31, 1986—1,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25917————

Perforations

Perforated and open-hole intervals.

FromToType
1,0401,042Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1557.875210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 1995Nov 13, 1995—
00Oct 7, 1987Jun 10, 1987Yes
00Sep 3, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.15K
bbl, last 12 reported months
200K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000063810H-1 InjectionActive5005001,040–1,060

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,150 · prior 12 9,100(+1%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00939529, documented in the API reference.