WELL · 42-009-39705 · DISTRICT 9

Parkey -D- #4

N

Archer County · Dukiel (Thomas Sand) field  · Vertical

Parkey -D- #4 (API 42-009-39705) is a well in Archer County operated by Haigood & Campbell, completed June 10, 1987.

The RRC has issued one drilling permit (amended once), issued March 9, 1987, permitted to 1,996 ft.

It was permitted by Campbell Oil CO. and has since transferred to Haigood & Campbell on the wellbore schedule.

Completion filings report one formation top, including Thomas Sand.

Its 2 leases have reported 36.3K barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The leases carry 19 wells, so these are lease totals, not this well alone.

Operator of record

Haigood & Campbell

Permitted by Campbell Oil Co.; the EWA schedule now lists a different operator.

Archer City, TX · P-5 Y, filed Sep 8, 2023 · 20 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHaigood & Campbell
Production reportsWilson, Jakethrough May 2025
Latest permitCampbell Oil Co.Mar 9, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,996
total depth, ft
2
permits on file
Mar 9, 1987
last permit issued
Jun 10, 1987
completed
36.3K
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 10, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parkey "A" O-13-30157Dukiel (Thomas Sand)Wilson, Jake1526.5K0Feb 2003 – Jul 2026
Parkey -D- O-13-25830Dukiel (Thomas Sand)Haigood & Campbell49.82K36Jan 1993 – Mar 2008

Oil, barrels lease total

Last 12 months 19 · prior 12 246(-92%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Haigood & CampbellJan 1993 → Jul 2001
  2. 2Deen Drilling CompanyApr 2003 → Sep 2014
  3. 3DDC Production CompanyOct 2014 → Mar 2019
  4. 4Schenk Oil Co.Jan 2023 → Feb 2025
  5. 5Wilson, JakeMar 2025 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
327362-98DrillCampbell Oil Co.Jul 27, 1987Mar 9, 1987—1,996
327362-99DrillCampbell Oil Co.Mar 5, 1987Mar 9, 1987—1,996

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25830————
—— O-13-30157————

Formation tops

As filed on W-2/G-1. Subsea from 1,071 ft elevation.Download CSV →

FormationMD ftSubsea
Thomas Sand1,510-439

Perforations

Perforated and open-hole intervals.

FromToType
1,5101,514Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
71031145 S
4.51,5437.87540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 23, 2003Jun 22, 1987Yes
00Sep 4, 1987Jun 22, 1987Yes
00Aug 1, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118871H-1 InjectionNot activated1507551,510–1,514

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00939705, documented in the API reference.