WELL · 42-009-40040 · DISTRICT 9

Key Brothers #1

N

Archer County · Archer County Regular field  · Vertical

Key Brothers #1 (API 42-009-40040) is a well in Archer County operated by Chital Petroleum Corp., completed December 21, 1988.

The RRC has issued one drilling permit (amended once), issued December 5, 1988, permitted to 5,300 ft.

Completion filings report 7 formation tops, including Gunsight, Palo Pinto, Smithwick, Caddo.

Its lease has reported 29.1K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Chital Petroleum Corp.

Wichita Falls, TX · P-5 Y, filed Sep 6, 2002 · 170 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChital Petroleum Corp.
Production reportsWalker Operating (I)through Apr 2026
Latest permitIngram, J. Oil & Gas Inc.Dec 5, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
2
permits on file
Dec 5, 1988
last permit issued
Dec 21, 1988
completed
29.1K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 21, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Key Brothers O-13-27412NealWalker Operating (I)129.1K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 374 · prior 12 635(-41%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rogers Drilling Co.Jan 1993 → Jun 1997
  2. 2Royal Texas PetroleumJul 1997 → Jun 1998
  3. 3T C Operating CompanyNov 1999 → Dec 1999
  4. 4A & B ProductionJan 2000 → May 2001
  5. 5Well Recycling CompanyJun 2001 → Jun 2002
  6. 6Scribner, JeffJul 2002 → Dec 2004
  7. 7Z&G OperatingJan 2005 → Sep 2011
  8. 8MSB OperatingOct 2011 → Jan 2018
  9. 9Walker Operating (I)Feb 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
353976-98Field transferChital Petroleum Corp.Feb 13, 1989Dec 5, 1988—5,121
353976-99DrillIngram, J. Oil & Gas Inc.Dec 5, 1988Dec 5, 1988—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27412————

Formation tops

As filed on W-2/G-1. Subsea from 1,178 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT LIME1,050128
Palo PintoPALO PINTO LIME2,838-1,660
SmithwickSMITHWICK SHALE4,587-3,409
CaddoCADDO LIME4,597-3,419
Caddo4,620-3,442
Conglomerate4,975-3,797
Conglomerate5,031-3,853
BarnettBARNETT SHALE5,093-3,915
MississippianMISSISSIPPI LIME5,104-3,926

Perforations

Perforated and open-hole intervals.

FromToType
5,1045,121Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62511612.2595 S
4.55,1047.875145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 16, 2025Apr 29, 2025—
00Jun 1, 1989Feb 10, 1989—
00May 24, 1989——
00Feb 2, 1989Dec 29, 1988Yes
00Jan 21, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127232H-1 InjectionNot activated6002,5005,052–5,120

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940040, documented in the API reference.