WELL · 42-009-40096 · DISTRICT 9
Parkey F #8
Archer County · Dukiel (Thomas Sand) field · Vertical
Parkey F #8 (API 42-009-40096) is a well in Archer County operated by Haigood & Campbell, completed August 5, 1989.
The RRC has issued one drilling permit, issued June 14, 1989, permitted to 1,995 ft.
It was permitted by Campbell Oil CO. and has since transferred to Haigood & Campbell on the wellbore schedule.
Completion filings report one formation top, including Thomas Sand.
Its 2 leases have reported 49.8K barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The leases carry 23 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Campbell Oil Co.; the EWA schedule now lists a different operator.
Archer City, TX · P-5 Y, filed Sep 8, 2023 · 20 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Haigood & Campbell |
| Production reports | Wilson, Jakethrough May 2025 |
| Latest permit | Campbell Oil Co.Jun 14, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,995
- total depth, ft
- 1
- permits on file
- Jun 14, 1989
- last permit issued
- Aug 5, 1989
- completed
- 49.8K
- cumulative oil, bbl
- 36
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 5, 1989
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parkey F O-13-26466 | Dukiel (Thomas Sand) | Haigood & Campbell | 8 | 23.3K | 36 | Jan 1993 – Jul 2026 |
| Parkey "A" O-13-30157 | Dukiel (Thomas Sand) | Wilson, Jake | 15 | 26.5K | 0 | Feb 2003 – Jul 2026 |
Oil, barrels lease total
Last 12 months 19 · prior 12 246(-92%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Haigood & CampbellJan 1993 → May 2001
- 2Deen Drilling CompanyApr 2003 → Sep 2014
- 3DDC Production CompanyOct 2014 → Mar 2019
- 4Schenk Oil Co.Jan 2023 → Feb 2025
- 5Wilson, JakeMar 2025 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 360384-99 | Drill | Campbell Oil Co. | Jun 13, 1989 | Jun 14, 1989 | — | 1,995 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26466 | — | — | — | — |
| — | — O-13-30157 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,086 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas Sand | 1,497 | -411 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,497 | 1,508 | Perforated |
| 1,515 | 1,522 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 105 | 12.25 | 85 S |
| 4.5 | 1,557 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 23, 2003 | Aug 15, 1989 | Yes |
| 00 | Aug 25, 1989 | Aug 15, 1989 | Yes |
| 00 | Aug 22, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-40096 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-40096 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00940096, documented in the API reference.