WELL · 42-009-40120 · DISTRICT 9

Marti #3

Plugged

Archer County · Archer County Regular field  · Vertical

Marti #3 (API 42-009-40120) is a plugged well in Archer County, plugged August 24, 2011, last operated by Maverick Petroleum Companies.

The RRC has issued one drilling permit, issued August 17, 1989, permitted to 1,650 ft.

Completion filings report one formation top, including Gunsight.

Operator of record

Maverick Petroleum Companies

Plano, TX · P-5 Y, filed Mar 4, 2016 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMaverick Petroleum Companies
Production reportsnone
Latest permitMaverick Petroleum CompaniesAug 17, 1989
1,650
total depth, ft
1
permits on file
Aug 17, 1989
last permit issued
Aug 18, 1989
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 1989
Shut in
—
Plugged
Aug 24, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Marti O-13-27495Archer County RegularMaverick Petroleum Companies200Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
362650-99DrillMaverick Petroleum CompaniesAug 11, 1989Aug 17, 1989—1,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27495————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight1,615

Perforations

Perforated and open-hole intervals.

FromToType
1,6151,620Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6266.75230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 1990Mar 27, 1990Yes
00May 24, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940120, documented in the API reference.