WELL · 42-009-40135 · DISTRICT 9

Bell Grace #11S

Plugged

Archer County · Archer County Regular field  · Vertical

Bell Grace #11S (API 42-009-40135) is a plugged well in Archer County, plugged September 1, 2023, last operated by Twin Oaks Construction Company.

The RRC has issued one drilling permit, issued September 25, 1989, permitted to 1,500 ft.

It was permitted by Lewis & Hays and has since transferred to Twin Oaks Construction Company on the wellbore schedule.

Completion filings report 2 formation tops, including Sandy-Shale, Thomas Sand.

Its lease has reported 13.7K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Twin Oaks Construction Company

Permitted by Lewis & Hays; the EWA schedule now lists a different operator.

Irving, TX · P-5 Y, filed Sep 4, 2025 · 2 permits on file · (972) 929-0260

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTwin Oaks Construction Company
Production reportsTwin Oaks Construction Companythrough Jul 2022
Latest permitLewis & HaysSep 25, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Sep 25, 1989
last permit issued
Mar 11, 2009
completed
13.7K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 11, 2009
Shut in
—
Plugged
Sep 1, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bell, Grace O-13-19261Archer County RegularTwin Oaks Construction Company913.7K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lewis & HaysJan 1993 → Mar 1993
  2. 2Deen Drilling CompanyApr 1993 → Jun 2007
  3. 3Twin Oaks Construction CompanyJul 2007 → Jul 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
363997-99DrillLewis & HaysSep 15, 1989Sep 25, 1989Oct 24, 19891,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19261————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Sandy-Shale962
Thomas Sand1,000

Perforations

Perforated and open-hole intervals.

FromToType
964965Perforated
964980Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59766.75145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 25, 2014Feb 24, 2012—
00Apr 15, 1991Jan 24, 1991Yes
00Feb 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.53K
bbl, all reported
Dec 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099905H-1 InjectionPlugged Sep 26, 2023100480964–980

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940135, documented in the API reference.