WELL · 42-009-40205 · DISTRICT 9

Texaco-Harmel #2

Plugged

Archer County · Archer County Regular field  · Vertical

Texaco-Harmel #2 (API 42-009-40205) is a plugged well in Archer County, plugged October 3, 2006, last operated by Sunday Corporation.

The RRC has issued one drilling permit, issued January 24, 1990, permitted to 4,999 ft.

It was permitted by Buckalew, Don and has since transferred to Sunday Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Palo Pinto, Tx Lime, Strawn.

Its lease has reported 26.2K barrels of oil and 34 mcf of gas since January 1993, last reporting in March 2008. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Sunday Corporation

Permitted by Buckalew, Don; the EWA schedule now lists a different operator.

Olney, TX · P-5 Y, filed Apr 6, 2018 · 96 permits on file · (940) 564-0339

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSunday Corporation
Production reportsSunday Corporationthrough Nov 2006
Latest permitBuckalew, DonJan 24, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Jan 24, 1990
last permit issued
Jul 2, 1990
completed
26.2K
cumulative oil, bbl
34
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 2, 1990
Shut in
—
Plugged
Oct 3, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texaco-Harmel O-13-27108Archer County RegularSunday Corporation326.2K34Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chardonnay Operating, Inc.Jan 1993 → Dec 1996
  2. 2Sunday CorporationJan 1997 → Nov 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
368525-99DrillBuckalew, DonJan 11, 1990Jan 24, 1990—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27108————

Formation tops

As filed on W-2/G-1. Subsea from 1,307 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,023-1,716
TX Lime3,338-2,031
StrawnSTRAWN SAND3,398-2,091

Perforations

Perforated and open-hole intervals.

FromToType
3,1203,130Perforated
3,1243,125Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.25110 S
4.53,3997.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 29, 1996Jul 24, 1996—
00Aug 10, 1990Jul 10, 1990Yes
00Aug 4, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.7K
bbl, last 12 reported months
352K
bbl, all reported
Dec 2005
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000078568H-1 InjectionPlugged Oct 17, 20062005003,120–3,130

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,700 · prior 12 9,375(+14%)

02K4K6K20042005

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940205, documented in the API reference.