WELL · 42-009-40233 · DISTRICT 9

Carr #1

Plugged

Archer County · Megargel (Caddo) field  · Vertical

Carr #1 (API 42-009-40233) is a plugged well in Archer County, plugged March 20, 1991, last operated by Sky Development Corp..

The RRC has issued one drilling permit, issued March 22, 1990, permitted to 4,999 ft.

It was permitted by Sky Development Corporation and has since transferred to Sky Development Corp. on the wellbore schedule.

Operator of record

Sky Development Corp.

Permitted by Sky Development Corporation; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSky Development CorporationMar 22, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Mar 22, 1990
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 20, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
371236-99DrillSky Development CorporationMar 21, 1990Mar 22, 1990Apr 8, 19904,999

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082654W-14 DisposalPlugged Mar 20, 19911,0001,3002,700–2,790

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940233, documented in the API reference.