WELL · 42-009-40348 · DISTRICT 9
Texaco-Harmel #4
Archer County · Archer County Regular field · Vertical
Texaco-Harmel #4 (API 42-009-40348) is a plugged well in Archer County, plugged May 17, 2007, last operated by Sunday Corporation.
The RRC has issued one drilling permit, issued October 19, 1990, permitted to 4,999 ft.
It was permitted by Chardonnay Operating, Inc. and has since transferred to Sunday Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Thomas Sand, Gunsight, Palo Pinto.
Its lease has reported 26.2K barrels of oil and 34 mcf of gas since January 1993, last reporting in March 2008. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chardonnay Operating, Inc.; the EWA schedule now lists a different operator.
Olney, TX · P-5 Y, filed Apr 6, 2018 · 96 permits on file · (940) 564-0339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sunday Corporation |
| Production reports | Sunday Corporationthrough Nov 2006 |
| Latest permit | Chardonnay Operating, Inc.Oct 19, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 1
- permits on file
- Oct 19, 1990
- last permit issued
- Dec 20, 1990
- completed
- 26.2K
- cumulative oil, bbl
- 34
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 20, 1990
- Shut in
- —
- Plugged
- May 17, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Texaco-Harmel O-13-27108 | Archer County Regular | Sunday Corporation | 3 | 26.2K | 34 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chardonnay Operating, Inc.Jan 1993 → Dec 1996
- 2Sunday CorporationJan 1997 → Nov 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 379309-99 | Drill | Chardonnay Operating, Inc. | Oct 11, 1990 | Oct 19, 1990 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27108 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,297 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas SandTHOMAS | 900 | 397 |
| Gunsight | 1,450 | -153 |
| Palo Pinto | 3,093 | -1,796 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,097 | 3,101 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 122 | 12.25 | 100 S |
| 4.5 | 3,101 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 1991 | Jan 29, 1991 | Yes |
| 00 | Feb 14, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-40348 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-40348 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00940348, documented in the API reference.