WELL · 42-009-40359 · DISTRICT 9
Parkey C-37 #2
Archer County · Parkey South (Miss) field · Vertical
Parkey C-37 #2 (API 42-009-40359) is a plugged well in Archer County, plugged August 16, 1999, last operated by Rogers Drilling CO..
The RRC has issued 2 drilling permits between 1990 and 1992, permitted to 5,600 ft.
Completion filings report 3 formation tops, including Palo Pinto, Caddo, Mississippian.
Its 2 leases have reported 10.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in December 1999. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Olney, TX · P-5 Y, filed Jul 6, 2012 · 437 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rogers Drilling Co. |
| Production reports | Rogers Drilling Co.through Sep 1998 |
| Latest permit | Rogers Drilling Co.Dec 7, 1992 |
- 5,600
- total depth, ft
- 2
- permits on file
- Dec 7, 1992
- last permit issued
- Jan 24, 1991
- completed
- 10.8K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 24, 1991
- Shut in
- —
- Plugged
- Aug 16, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parkey C-37 O-13-27861 | Parkey, South (Miss) | Rogers Drilling Co. | 3 | 6.77K | 0 | Jan 1993 – Dec 1999 |
| Parkey C-37 O-13-28460 | H. F. F. (Caddo) | Rogers Drilling Co. | 2 | 4.05K | 21 | Jan 1993 – Aug 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rogers Drilling Co.Jan 1993 → Sep 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 406656-99 | Recompletion | Rogers Drilling Co. | Nov 30, 1992 | Dec 7, 1992 | Nov 9, 1992 | 4,990 |
| 380311-99 | Drill | Rogers Drilling Co. | Oct 29, 1990 | Nov 7, 1990 | Nov 13, 1990 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27861 | — | — | — | — |
| — | — O-13-28460 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,115 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,242 | -2,127 |
| Caddo | 4,880 | -3,765 |
| MississippianMISSISSIPPI | 5,282 | -4,167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,882 | 4,890 | Perforated |
| 5,289 | 5,303 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 109 | 12.25 | 90 S |
| 4.5 | 5,322 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 21, 1996 | Mar 12, 1996 | — |
| 00 | Feb 18, 1993 | Dec 21, 1992 | Yes |
| 00 | Dec 16, 1992 | — | — |
| 00 | Mar 14, 1991 | Feb 4, 1991 | Yes |
| 00 | Feb 14, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-40359 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-40359 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00940359, documented in the API reference.