WELL · 42-009-40401 · DISTRICT 9
Gray Grace #2
Archer County · Archer County Regular field · Vertical
Gray Grace #2 (API 42-009-40401) is a plugged well in Archer County, plugged March 2, 1999, last operated by Twin Oaks Construction Company.
The RRC has issued one drilling permit, issued January 11, 1991, permitted to 1,100 ft.
It was permitted by Gray Production Trust and has since transferred to Twin Oaks Construction Company on the wellbore schedule.
Completion filings report one formation top, including Thomas Sand.
Its lease has reported 518 barrels of oil and 64 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Twin Oaks Construction Company
Permitted by Gray Production Trust; the EWA schedule now lists a different operator.
Irving, TX · P-5 Y, filed Sep 4, 2025 · 2 permits on file · (972) 929-0260
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Twin Oaks Construction Company |
| Production reports | Gray Production Trustthrough Jul 2003 |
| Latest permit | Gray Production TrustJan 11, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,100
- total depth, ft
- 1
- permits on file
- Jan 11, 1991
- last permit issued
- Apr 18, 1991
- completed
- 518
- cumulative oil, bbl
- 64
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 18, 1991
- Shut in
- —
- Plugged
- Mar 2, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gray, Grace O-13-28024 | Archer County Regular | Twin Oaks Construction Company | 4 | 518 | 64 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gray Production TrustJan 1993 → Feb 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 383296-99 | Drill | Gray Production Trust | Jan 10, 1991 | Jan 11, 1991 | Jan 15, 1991 | 1,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28024 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,025 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas SandTHOMAS | 980 | 45 |
| Thomas Sand | 980 | 45 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 988 | 990 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,016 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 27, 1991 | Nov 5, 1991 | — |
| 00 | Nov 20, 1991 | Oct 4, 1991 | — |
| 00 | Jun 7, 1991 | May 7, 1991 | Yes |
| 00 | May 23, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-40401 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-40401 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00940401, documented in the API reference.