WELL · 42-009-40511 · DISTRICT 9

O Donohoe #7

Y

Archer County · Archer County Regular field · Injection  · Vertical

O Donohoe #7 (API 42-009-40511) is a well in Archer County operated by Akins Oil Company, completed February 22, 2000 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 29, 1991, permitted to 1,999 ft.

It was permitted by Crutcher, David F. Inc. and has since transferred to Akins Oil Company on the wellbore schedule.

Completion filings report 4 formation tops, including Delmar, Demar, Thomas Sand, Gunsight.

Its lease has reported 27.5K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 21.9K barrels injected in the 12 months reported through December 2025.

Operator of record

Akins Oil Company

Permitted by Crutcher, David F. Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Oct 4, 2025 · 10 permits on file · (940) 631-9419

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAkins Oil Company
Production reportsAkins Oil Companythrough Sep 2016
Latest permitCrutcher, David F. Inc.Aug 29, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Aug 29, 1991
last permit issued
Feb 22, 2000
completed
27.5K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 22, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O'Donohoe O-13-26845Archer County RegularAkins Oil Company527.5K19Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Talon Production, Inc.Jan 1993 → Mar 1994
  2. 2Shelley, Richard WApr 1994 → Apr 2000
  3. 3Akins Oil CompanyMay 2000 → Sep 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391222-99DrillCrutcher, David F. Inc.Aug 26, 1991Aug 29, 1991Aug 1, 19931,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-26845————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Delmar1,302
Demar1,302
Thomas SandTHOMAS1,394
Gunsight1,592

Perforations

Perforated and open-hole intervals.

FromToType
1,4421,596Perforated
1,5921,594Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6506.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 25, 2000May 15, 2000—
00Oct 20, 1993Sep 2, 1993Yes
00Sep 10, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

21.9K
bbl, last 12 reported months
712K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086434H-1 InjectionActive1,0007001,442–1,596

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 21,900 · prior 12 21,900(+0%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940511, documented in the API reference.