WELL · 42-009-40738 · DISTRICT 9

Andrews #1 J

Y

Archer County · Archer County Regular field · Shut IN  · Vertical

Andrews #1 J (API 42-009-40738) is a well in Archer County operated by Just Oil & Gas Inc., completed March 21, 1988 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued April 19, 1993, permitted to 1,469 ft.

It was permitted by Morgan, C. V. Partnership and has since transferred to Just Oil & Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 10.2K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Just Oil & Gas Inc.

Permitted by Morgan, C. V. Partnership; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (940) 550-4325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJust Oil & Gas Inc.
Production reportsJust Oil & Gas, Inc.through Apr 2020
Latest permitMorgan, C. V. PartnershipApr 19, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,469
total depth, ft
1
permits on file
Apr 19, 1993
last permit issued
Mar 21, 1988
completed
10.2K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 1988
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Andrews O-13-544Archer County RegularJust Oil & Gas, Inc.510.2K22Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Morgan, C. V. PartnershipJan 1993 → Jan 2009
  2. 2Guidance Oil DEVELOPERS,INC.(1)Feb 2009 → Jan 2018
  3. 3Just Oil & Gas, Inc.Feb 2018 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410783-99DrillMorgan, C. V. PartnershipApr 16, 1993Apr 19, 1993Mar 16, 19881,469

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-544————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight1,402

Perforations

Perforated and open-hole intervals.

FromToType
1,3921,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4696.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 22, 2003Feb 25, 2002—
00Mar 18, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.31M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092849H-1 InjectionActive4006501,392–1,402

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940738, documented in the API reference.