WELL · 42-009-40745 · DISTRICT 9

Mitchell #2

Plugged

Archer County · Archer County Regular field  · Vertical

Mitchell #2 (API 42-009-40745) is a plugged well in Archer County, plugged November 19, 2019, last operated by Cvs Operating LLC..

The RRC has issued one drilling permit, issued May 13, 1993, permitted to 1,700 ft.

It was permitted by 3-C and has since transferred to Cvs Operating LLC. on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 12.2K barrels of oil and 14 mcf of gas since June 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

CVS Operating LLC.

Permitted by 3-C; the EWA schedule now lists a different operator.

Plano, TX · P-5 Y, filed Jan 3, 2020 · (972) 312-0070

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCVS Operating LLC.
Production reportsCVS Operating, LLC.through Dec 2016
Latest permit3-CMay 13, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,700
total depth, ft
1
permits on file
May 13, 1993
last permit issued
Jan 6, 1994
completed
12.2K
cumulative oil, bbl
14
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1994
Shut in
—
Plugged
Nov 19, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mitchell O-13-28595Archer County RegularCVS Operating, LLC.712.2K14Jun 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 13-CJun 1993 → Apr 2002
  2. 2Estacado Energy, LLCMay 2002 → Dec 2007
  3. 3AG Operating Company LLCJan 2008 → Feb 2010
  4. 4Utility Ventures CompanyAug 2010 → Aug 2011
  5. 5Pro. Energy I Resource, LLCJun 2013 → May 2014
  6. 6CVS Operating, LLC.Mar 2015 → Dec 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
411533-99Drill3-CMay 10, 1993May 13, 1993Jun 3, 19931,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-28595————

Formation tops

As filed on W-2/G-1. Subsea from 1,260 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsight11,259

Perforations

Perforated and open-hole intervals.

FromToType
1,3081,312Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,3567.875285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 1994Jan 11, 1994—
00Jul 29, 1993Jul 8, 1993Yes
00Jul 15, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.43K
bbl, last 12 reported months
516K
bbl, all reported
Dec 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079910H-1 InjectionPlugged Dec 5, 2019752001,308–1,312

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,430 · prior 12 20,488(-54%)

01K2K20152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940745, documented in the API reference.