WELL · 42-009-40953 · DISTRICT 9

Prideaux -37- #2

Plugged

Archer County · Archer County Regular field  · Vertical

Prideaux -37- #2 (API 42-009-40953) is a plugged well in Archer County, plugged February 4, 2019, last operated by Mccauley Production.

The RRC has issued one drilling permit, issued July 13, 1995, permitted to 1,600 ft.

It was permitted by Wilson Operating CO. and has since transferred to Mccauley Production on the wellbore schedule.

Completion filings report 2 formation tops, including Gunsite, Gunsite Sand.

Its lease has reported 539 barrels of oil and 85 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

McCauley Production

Permitted by Wilson Operating Co.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Oct 4, 2025 · 13 permits on file · (940) 389-6017

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcCauley Production
Production reportsB & M Productionthrough Feb 2001
Latest permitWilson Operating Co.Jul 13, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,600
total depth, ft
1
permits on file
Jul 13, 1995
last permit issued
—
completed
539
cumulative oil, bbl
85
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 4, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Prideaux -37- O-13-26059Archer County RegularMcCauley Production253985Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wilson Operating Co.Jan 1993 → Feb 2000
  2. 2B & M ProductionSep 2000 → Feb 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437721-99DrillWilson Operating Co.Jul 11, 1995Jul 13, 1995May 6, 19861,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-26059————

Formation tops

As filed on W-2/G-1. Subsea from 1,050 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsite1,410-360
Gunsite Sand1,410-360

Perforations

Perforated and open-hole intervals.

FromToType
1,4101,412Perforated
1,4101,412Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4106.75225 S
4.51,4126.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2001Jun 21, 2001—
00Aug 29, 2001Jul 20, 2001—
00May 10, 2000Feb 17, 2000—
00Feb 12, 1997Dec 4, 1996—
00Nov 1, 1995Jul 25, 1995Yes
00Aug 8, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
14.7K
bbl, all reported
Dec 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083546H-1 InjectionPlugged Feb 27, 20191005001,410–1,412

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00940953, documented in the API reference.