WELL · 42-009-40955 · DISTRICT 9

Seisma-Richardson Trust - A #1

Plugged

Archer County · Olney N W. (Miss.) field  · Vertical

Seisma-Richardson Trust - A #1 (API 42-009-40955) is a plugged well in Archer County, plugged March 27, 1998, last operated by Guidance Oil Developers.

The RRC has issued one drilling permit (amended once), issued July 13, 1995, permitted to 5,200 ft.

It was permitted by Seisma Drilling Corporation and has since transferred to Guidance Oil Developers on the wellbore schedule.

Completion filings report 5 formation tops, including Gunsight, Palo Pinto, Caddo, Barnett.

Its lease has reported 750 barrels of oil since July 1995, last reporting in July 1998.

Operator of record

Guidance Oil Developers

Permitted by Seisma Drilling Corporation; the EWA schedule now lists a different operator.

Boerne, TX · P-5 Y, filed Feb 4, 2026 · 127 permits on file · (210) 383-6414

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGuidance Oil Developers
Production reportsSeisma Drilling Corporationthrough Nov 1997
Latest permitSeisma Drilling CorporationJul 13, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
2
permits on file
Jul 13, 1995
last permit issued
Jul 29, 1995
completed
750
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Jul 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 29, 1995
Shut in
—
Plugged
Mar 27, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seisma-Richardson Trust - A O-13-29028Olney, N W. (Miss.)Guidance Oil Developers17500Jul 1995 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Seisma Drilling CorporationAug 1995 → Nov 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437751-98DrillSeisma Drilling CorporationSep 7, 1995Jul 13, 1995Jul 14, 19955,200
437751-99DrillSeisma Drilling CorporationJul 12, 1995Jul 13, 1995—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29028————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
GunsightGUNSIGHT LIME1,197
Palo PintoPALO PINTO LIME2,862
CaddoCADDO LIME4,493
BarnettBARNETT SHALE4,969
MississippianMISS LIME4,985

Perforations

Perforated and open-hole intervals.

FromToType
4,9885,034Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530312.25225 S
4.54,9878.625250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 1998Oct 10, 1997—
00Oct 30, 1995Sep 14, 1995Yes
00Oct 4, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.85K
bbl, last 12 reported months
2.85K
bbl, all reported
Jan 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084095W-14 DisposalPlugged May 4, 19981,0005901,180–1,200

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 2,849

02004001997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.