WELL · 42-009-41091 · DISTRICT 9
Calvin O. -B- #11B
Archer County · Wainwright (Gunsight) field · NO Production · Vertical
Calvin O. -B- #11B (API 42-009-41091) is a well in Archer County operated by Portana Properties LLC, completed March 20, 1997 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued January 27, 1997, permitted to 1,200 ft.
It was permitted by Legacy Petroleum Corporation and has since transferred to Portana Properties LLC on the wellbore schedule.
Completion filings report one formation top, including Gunsigt Lm.
Its lease has reported 37.9K barrels of oil and 54 mcf of gas since January 1993, last reporting in July 2026. The lease carries 24 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Legacy Petroleum Corporation; the EWA schedule now lists a different operator.
McKinney, TX · P-5 Y, filed Jun 4, 2026 · (805) 904-7209
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Portana Properties LLC |
| Production reports | Portana Properties LLCthrough May 2025 |
| Latest permit | Legacy Petroleum CorporationJan 27, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,200
- total depth, ft
- 1
- permits on file
- Jan 27, 1997
- last permit issued
- Mar 20, 1997
- completed
- 37.9K
- cumulative oil, bbl
- 54
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 20, 1997
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Calvin, O. -B- O-13-1338 | Wainwright (Gunsight) | Portana Properties LLC | 24 | 37.9K | 54 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 25 · prior 12 210(-88%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Yazell Oil & GasJan 1993 → Jul 1994
- 2Legacy Petroleum CorporationAug 1994 → Jun 1999
- 3Carloran Production CorpJul 1999 → Sep 2001
- 4Beisch, RustySep 2002 → May 2003
- 5L-R ProductionApr 2006 → Jun 2023
- 6Portana Properties LLCJul 2023 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 457521-99 | Drill | Legacy Petroleum Corporation | Jan 17, 1997 | Jan 27, 1997 | Feb 7, 1997 | 1,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-1338 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,063 | 1,066 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,115 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 9, 1997 | Mar 27, 1997 | Yes |
| 00 | Apr 3, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-41091 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-41091 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.