WELL · 42-009-41517 · DISTRICT 9

Crosthwait A #2

Y

Archer County · Archer County Regular field · Injection  · Vertical

Crosthwait A #2 (API 42-009-41517) is a well in Archer County operated by Olney Oil LLC, completed August 30, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 31, 2005, permitted to 1,500 ft.

It was permitted by Palmer, John LLC and has since transferred to Olney Oil LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Gunsignt Lime, G.S. Upper Sand, Gunsight, G.S. Lower.

Its lease has reported 24.9K barrels of oil and 64 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 50K barrels injected in the 12 months reported through December 2025.

Operator of record

Olney Oil LLC

Permitted by Palmer, John LLC; the EWA schedule now lists a different operator.

Boerne, TX · P-5 Y, filed Dec 4, 2025 · 5 permits on file · (210) 383-6414

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOlney Oil LLC
Production reportsOlney Oil LLCthrough Apr 2026
Latest permitPalmer, John LLCOct 31, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Oct 31, 2005
last permit issued
Aug 30, 2024
completed
24.9K
cumulative oil, bbl
64
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 30, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crosthwait A O-13-20508Archer County RegularOlney Oil LLC524.9K64Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 544 · prior 12 620(-12%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Palmer, John Inc.Jan 1993 → Feb 1994
  2. 2Palmer, John LLCMar 1994 → Jan 2022
  3. 3Olney Oil LLCMar 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
608531-99DrillPalmer, John LLCOct 26, 2005Oct 31, 2005Nov 9, 20051,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-20508————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsignt Lime1,253
G.S. Upper Sand1,263
GunsightGUNSIGHT SAND1,270
G.S. Lower1,272

Perforations

Perforated and open-hole intervals.

FromToType
1,2761,277Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2977.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2024Sep 4, 2024—
00Aug 16, 2006Mar 3, 2006Yes
00Apr 17, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

50K
bbl, last 12 reported months
50K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000126724H-1 InjectionActive5006351,270–1,295

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 50,000 · prior 12 0

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00941517, documented in the API reference.