WELL · 42-009-41653 · DISTRICT 9
Aminex #2
Archer County · Archer County Regular field · Vertical
Aminex #2 (API 42-009-41653) is a plugged well in Archer County, plugged October 3, 2008, last operated by Texoma Oil Tools Inc..
The RRC has issued one drilling permit, issued May 7, 2007, permitted to 5,500 ft.
It was permitted by Ginnings Company and has since transferred to Texoma Oil Tools Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Thomas Sand, Gunsight, Lo. Gunsight Sand, Caddo.
Its lease has reported 280 barrels of oil since November 2007, last reporting in February 2009.
Operator of record
Permitted by Ginnings Company; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (940) 733-4511
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texoma Oil Tools Inc. |
| Production reports | Texoma Oil Tools, Inc.through Mar 2008 |
| Latest permit | Ginnings CompanyMay 7, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- May 7, 2007
- last permit issued
- Jun 6, 2007
- completed
- 280
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Feb 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 2007
- Shut in
- —
- Plugged
- Oct 3, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Aminex O-13-30886 | Archer County Regular | Texoma Oil Tools, Inc. | 1 | 280 | 0 | Nov 2007 – Feb 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texoma Oil Tools, Inc.Jan 2008 → Mar 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 637389-99 | Drill | Ginnings Company | Apr 18, 2007 | May 7, 2007 | May 15, 2007 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30886 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,030 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas Sand | 1,239 | -209 |
| GunsightGUNSIGHT LIME | 1,489 | -459 |
| Lo. Gunsight Sand | 1,562 | -532 |
| CaddoCADDO LIME | 4,958 | -3,928 |
| Ellenburger | 5,380 | -4,350 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,964 | 4,968 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 122 | 12.25 | 100 S |
| 4.5 | 5,450 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 22, 2008 | Nov 19, 2007 | Yes |
| 00 | Jan 16, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-41653 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-41653 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00941653, documented in the API reference.