WELL · 42-009-41732 · DISTRICT 9

Turbeville-Tidal #56

Y

Archer County · Archer County Regular field · Injection  · Vertical

Turbeville-Tidal #56 (API 42-009-41732) is a well in Archer County operated by Walker Operating (I), completed November 20, 2007 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 9, 2007, permitted to 2,000 ft.

It was permitted by Msb Operating and has since transferred to Walker Operating (I) on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 67.7K barrels of oil and 80 mcf of gas since January 1993, last reporting in July 2026. The lease carries 15 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 35.8K barrels injected in the 12 months reported through December 2025.

Operator of record

Walker Operating (I)

Permitted by MSB Operating; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Nov 4, 2025 · (940) 733-6111

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalker Operating (I)
Production reportsWalker Operating (I)through Apr 2026
Latest permitMSB OperatingNov 9, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Nov 9, 2007
last permit issued
Nov 20, 2007
completed
67.7K
cumulative oil, bbl
80
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 20, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Turbeville-Tidal O-13-540Archer County RegularWalker Operating (I)1567.7K80Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,603 · prior 12 1,478(+8%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L & H Oil CompanyJan 1993 → May 1999
  2. 2Quatro Oil and Gas, Inc.Jun 1999 → Mar 2004
  3. 3MSB OperatingApr 2004 → Jan 2018
  4. 4Walker Operating (I)Feb 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
648881-99DrillMSB OperatingNov 1, 2007Nov 9, 2007Nov 12, 20072,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-540————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight1,518

Perforations

Perforated and open-hole intervals.

FromToType
1,5181,522Perforated
1,5181,538Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,5966.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2015Mar 25, 2015—
00Apr 30, 2015Jul 9, 2014—
00Aug 7, 2008Mar 3, 2008Yes
00Jul 10, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

35.8K
bbl, last 12 reported months
403K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110636H-1 InjectionActive6757551,518–1,538

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 35,762 · prior 12 38,458(-7%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00941732, documented in the API reference.