WELL · 42-009-42032 · DISTRICT 9
Abercrombie 81 #2
Archer County · Archer County Regular field · Vertical
Abercrombie 81 #2 (API 42-009-42032) is a plugged well in Archer County, plugged March 15, 2023, last operated by F&H Operating Company LLC.
The RRC has issued one drilling permit, issued August 13, 2009, permitted to 1,999 ft.
It was permitted by JL&M Energy, LLC and has since transferred to F&H Operating Company LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Water Sand, Thomas Sand.
Its lease has reported 9.15K barrels of oil since September 2009, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Jl&m Energy, LLC; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Jun 4, 2026 · (940) 733-7936
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | F&H Operating Company LLC |
| Production reports | F&H Operating Company LLCthrough Jan 2023 |
| Latest permit | Jl&m Energy, LLCAug 13, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Aug 13, 2009
- last permit issued
- Sep 7, 2009
- completed
- 9.15K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 7, 2009
- Shut in
- —
- Plugged
- Mar 15, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Abercrombie "81" O-13-31465 | Archer County Regular | F&H Operating Company LLC | 4 | 9.15K | 0 | Sep 2009 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jl&m Energy, LLCSep 2009 → Apr 2014
- 2SPH Development, LLCMay 2014 → Nov 2022
- 3F&H Operating Company LLCDec 2022 → Jan 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 683790-99 | Drill | Jl&m Energy, LLC | Aug 4, 2009 | Aug 13, 2009 | Aug 24, 2009 | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31465 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Water Sand | 680 |
| Thomas SandTHOMAS LIME | 1,130 |
| Thomas Sand | 1,140 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,141 | 1,148 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,197 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 2010 | Aug 9, 2010 | — |
| 00 | Feb 22, 2010 | Oct 6, 2009 | Yes |
| 00 | Dec 30, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-42032 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-42032 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.