WELL · 42-009-42175 · DISTRICT 9
Parkey B #1
Archer County · Parkey East (Caddo) field · Vertical
Parkey B #1 (API 42-009-42175) is a plugged well in Archer County, plugged August 20, 2015, last operated by Carrizo Oil & Gas Inc..
The RRC has issued 2 drilling permits between 2010 and 2012, permitted to 6,000 ft.
Completion filings report 3 formation tops, including Palo Pinto, Caddo, Mississippian.
Its 2 leases have reported 7.68K barrels of oil and 913 mcf of gas since September 2010, last reporting in March 2016. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Aug 7, 2020 · 1,194 permits on file · (713) 358-6255
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrizo Oil & Gas Inc. |
| Production reports | Carrizo Oil & Gas, Inc.through Jul 2015 |
| Latest permit | Carrizo Oil & Gas, Inc.Aug 2, 2012 |
- 6,000
- total depth, ft
- 2
- permits on file
- Aug 2, 2012
- last permit issued
- Jun 27, 2012
- completed
- 7.68K
- cumulative oil, bbl
- 913
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2010 THROUGH Mar 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 27, 2012
- Shut in
- —
- Plugged
- Aug 20, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parkey 'B' O-13-32463 | Parkey, East (Caddo) | Carrizo Oil & Gas, Inc. | 1 | 3.05K | 271 | Jun 2012 – Mar 2016 |
| Parkey "B" O-13-31888 | Dana, East (Miss) | Carrizo Oil & Gas, Inc. | 1 | 4.64K | 642 | Sep 2010 – Aug 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Carrizo Oil & Gas, Inc.Nov 2010 → Jul 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 745202-99 | Recompletion | Carrizo Oil & Gas, Inc. | Jul 24, 2012 | Aug 2, 2012 | Jun 13, 2012 | 6,000 |
| 696414-99 | Drill | Carrizo Oil & Gas, Inc. | May 21, 2010 | May 24, 2010 | Sep 6, 2010 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31888 | — | — | — | — |
| — | — O-13-32463 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,089 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,696 | -2,607 |
| Caddo | 4,948 | -3,859 |
| Mississippian | 5,250 | -4,161 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,948 | 4,970 | Perforated |
| 5,248 | 5,270 | Perforated |
| 5,248 | 5,292 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 292 | 12.25 | 200 S |
| 4.5 | 5,480 | 7.875 | 470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 2013 | Sep 11, 2012 | — |
| 00 | Oct 31, 2011 | May 5, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-42175 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-42175 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00942175, documented in the API reference.