WELL · 42-009-42627 · DISTRICT 9

Prothro #1

Y

Archer County · Archer County Regular field · Injection  · Vertical

Prothro #1 (API 42-009-42627) is a well in Archer County operated by Jlw Operations LLC, completed February 8, 2016 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 10, 2013, permitted to 5,200 ft.

It was permitted by Southern Exploration, Inc. and has since transferred to Jlw Operations LLC on the wellbore schedule.

Completion filings report one formation top, including KMA.

Its lease has reported 22.4K barrels of oil since November 2013, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 2.47K barrels injected in the 12 months reported through December 2025.

Operator of record

JLW Operations LLC

Permitted by Southern Exploration, Inc.; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Mar 4, 2026 · 9 permits on file · (940) 631-7134

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJLW Operations LLC
Production reportsJLW Operations, LLCthrough Apr 2026
Latest permitSouthern Exploration, Inc.Sep 10, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
Sep 10, 2013
last permit issued
Feb 8, 2016
completed
22.4K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 8, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Prothro O-13-32731Archer County RegularJLW Operations, LLC322.4K0Nov 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 1,430 · prior 12 1,331(+7%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southern Exploration, Inc.Nov 2013 → Jul 2017
  2. 2JLW Operations, LLCJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
769135-99DrillSouthern Exploration, Inc.Aug 28, 2013Sep 10, 2013Oct 25, 20135,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-32731————

Formation tops

As filed on W-2/G-1. Subsea from 1,075 ft elevation.Download CSV →

FormationMD ftSubsea
KMA3,521-2,446
KMA3,884-2,809

Perforations

Perforated and open-hole intervals.

FromToType
3,5213,525Perforated
3,8843,892Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513112.2585 S
5.55,1477.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 17, 2016Mar 3, 2016Yes
00Jan 2, 2014Dec 20, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.47K
bbl, last 12 reported months
170K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112121H-1 InjectionActive4,0001,7003,445–5,110

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,465 · prior 12 2,375(+4%)

010020030020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00942627, documented in the API reference.