WELL · 42-009-43056 · DISTRICT 9

C. L. Davis #9

Plugged

Archer County · Archer County Regular field  · Vertical

C. L. Davis #9 (API 42-009-43056) is a plugged well in Archer County, plugged March 22, 2019, last operated by Pro. Energy I Resource LLC.

The RRC has issued one drilling permit, issued August 8, 2016, permitted to 2,000 ft.

It was permitted by Pro. Energy I Resource, LLC and has since transferred to Pro. Energy I Resource LLC on the wellbore schedule.

Operator of record

Pro. Energy I Resource LLC

Permitted by Pro. Energy I Resource, LLC; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPro. Energy I Resource, LLCAug 8, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Aug 8, 2016
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 22, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
817413-99DrillPro. Energy I Resource, LLCAug 1, 2016Aug 8, 2016Jan 23, 20172,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115767H-1 InjectionPlugged Mar 29, 20195005151,042–1,077

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00943056, documented in the API reference.