WELL · 42-009-81305 · DISTRICT 9
Monahan, E.S. "A" #20
Archer County · Vertical
Monahan, E.S. "A" #20 (API 42-009-81305) is a former disposal or injection well in Archer County, last operated by Crutcher Oil Properties; its UIC permit is no longer active.
The RRC has issued one drilling permit, issued December 9, 1993, permitted to 1,500 ft.
Completion filings report 2 formation tops, including Gunsight, Gunsite.
Its lease has reported 2.66K barrels of oil and 78 mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Jun 3, 2016 · 31 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Gilliam Partners, L.P.through Mar 2017 |
| Latest permit | Crutcher Oil PropertiesDec 9, 1993 |
- 1,500
- total depth, ft
- 1
- permits on file
- Dec 9, 1993
- last permit issued
- —
- completed
- 2.66K
- cumulative oil, bbl
- 78
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monohan, E. S. O-13-333 | Archer County Regular | Gilliam Partners, L.P. | 7 | 2.66K | 78 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crutcher Oil PropertiesJan 1993 → Aug 1996
- 2B.E.G. ProductionSep 1996 → Feb 1999
- 3Estacado Energy, LLCApr 2002 → Nov 2007
- 4AG Operating Company LLCFeb 2008 → Feb 2009
- 5Utility Ventures CompanyNov 2010 → Feb 2012
- 6Gilliam Partners, L.P.Jan 2015 → Mar 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 418874-99 | Recompletion | Crutcher Oil Properties | Dec 2, 1993 | Dec 9, 1993 | — | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-333 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,260 | 1,272 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 1,260 | 7.5 | 25 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 22, 1998 | Oct 26, 1998 | — |
| 00 | May 4, 1993 | Mar 23, 1993 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-009-81305 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-009-81305 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.8K
- bbl, last 12 reported months
- 1.8K
- bbl, all reported
- Oct 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000030812 | UIC Permit | Plugged Apr 29, 2019 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,800 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00981305, documented in the API reference.