WELL · 42-013-31118 · DISTRICT 1
Henderson Garrett #5
Atascosa County · Fashing (Edwards Lime -B-) field · Vertical
Henderson Garrett #5 (API 42-013-31118) is a plugged well in Atascosa County, plugged September 10, 1996, last operated by Arco Oil & Gas CO..
The RRC has issued 3 drilling permits (amended once) between 1980 and 1990, permitted to 10,910 ft.
Completion filings report 4 formation tops, including Carrizo, Wilcox, Austin Chalk, Edwards.
Operator of record
Plano, TX · P-5 Y, filed Oct 7, 2005 · 3,065 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Arco Oil & Gas Co. |
| Production reports | none |
| Latest permit | Arco Oil & Gas Co.Dec 25, 1990 |
- 10,910
- total depth, ft
- 4
- permits on file
- Dec 25, 1990
- last permit issued
- Apr 30, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 30, 1989
- Shut in
- —
- Plugged
- Sep 10, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Henderson, Garrett G-1-142377 | Wildcat | Howell, David | 1 | 0 | 0 | Jan 1993 – Sep 1996 |
| — G-1-131421 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380735-98 | Recompletion | Arco Oil & Gas Co. | Aug 26, 1991 | Dec 25, 1990 | Aug 26, 1991 | 10,910 |
| 380735-99 | Recompletion | Arco Oil & Gas Co. | Nov 7, 1990 | Dec 25, 1990 | — | 10,910 |
| 356007-99 | Recompletion | Arco Oil & Gas Co. | Feb 13, 1989 | Apr 4, 1989 | — | 10,910 |
| 92827-99 | Drill | Arco Oil & Gas Co. | Sep 15, 1980 | Sep 15, 1980 | — | 10,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-131421 | — | — | — | — |
| — | — G-1-142377 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 465 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CarrizoCARRIZO WILCOX | 3,700 | -3,235 |
| WilcoxMIDDLE WILCOX | 5,100 | -4,635 |
| Austin ChalkAUSTIN | 9,850 | -9,385 |
| EdwardsEDWARDS LIME A | 10,434 | -9,969 |
| EdwardsEDWARDS LIME B | 10,700 | -10,235 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,475 | 10,495 | Perforated |
| 10,725 | 10,745 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,816 | 14.75 | 1,300 S |
| 2.375 | 10,375 | — | — |
| 7 | 10,910 | 9.875 | 1,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 1993 | Sep 4, 1992 | Yes |
| 00 | Oct 7, 1992 | — | — |
| 00 | Aug 28, 1989 | Jun 5, 1989 | Yes |
| 00 | Aug 15, 1989 | — | — |
| 00 | Jan 12, 1984 | Apr 27, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-31118 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-31118 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01331118, documented in the API reference.