WELL · 42-013-32860 · DISTRICT 1
Miller T.P. #3
Atascosa County · Somerset field · Vertical
Miller T.P. #3 (API 42-013-32860) is a plugged well in Atascosa County, plugged April 15, 1986, last operated by Mid-Continental Petroleum Inc..
The RRC has issued one drilling permit, issued July 23, 1984, permitted to 2,500 ft.
It was permitted by Neely, John P. and has since transferred to Mid-Continental Petroleum Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Wilcox, Lit, Olmos.
Operator of record
Mid-Continental Petroleum Inc.
Permitted by Neely, John P.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Apr 16, 1987 · 6 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mid-Continental Petroleum Inc. |
| Production reports | none |
| Latest permit | Neely, John P.Jul 23, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 1
- permits on file
- Jul 23, 1984
- last permit issued
- Dec 15, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 1984
- Shut in
- —
- Plugged
- Apr 15, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 245984-99 | Drill | Neely, John P. | Jul 23, 1984 | Jul 23, 1984 | — | 2,500 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,612 | 1,646 | Perforated |
| 1,740 | 1,750 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 2,410 | 6.75 | 152 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 10, 1985 | Dec 31, 1984 | — |
| 00 | Jan 8, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-32860 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-32860 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01332860, documented in the API reference.