WELL · 42-013-33740 · DISTRICT 1
Dominguez Oil Unit #1
Atascosa County · Crown E. (Navarro) field · Vertical
Dominguez Oil Unit #1 (API 42-013-33740) is a plugged well in Atascosa County, plugged October 22, 2008, last operated by Park Avenue Resources Inc..
The RRC has issued one drilling permit, issued February 24, 1986, permitted to 4,500 ft.
It was permitted by Colstar Petroleum, Corp. and has since transferred to Park Avenue Resources Inc. on the wellbore schedule.
Completion filings report one formation top, including Navarro.
Its lease has reported 1.35K barrels of oil and 27 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Colstar Petroleum, Corp.; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed Apr 2, 2015
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Park Avenue Resources Inc. |
| Production reports | Park Avenue Resources, Inc.through Jul 2001 |
| Latest permit | Colstar Petroleum, Corp.Feb 24, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Feb 24, 1986
- last permit issued
- May 12, 1986
- completed
- 1.35K
- cumulative oil, bbl
- 27
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 12, 1986
- Shut in
- —
- Plugged
- Oct 22, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dominguez Oil Unit O-1-11527 | Crown, E. (Navarro) | Park Avenue Resources, Inc. | 1 | 1.35K | 27 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Freeman, J. L., Oper.Jan 1993 → Nov 1994
- 2LPG Energy CompanyMar 1997 → Sep 1999
- 3Paladin Technology CorporationOct 1999 → Jan 2000
- 4Kade OilNov 2000 → Jun 2001
- 5Park Avenue Resources, Inc.Jul 2001 → Jul 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 298387-99 | Drill | Colstar Petroleum, Corp. | Feb 24, 1986 | Feb 24, 1986 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-11527 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,269 | 4,279 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 450 | 12.25 | 260 S |
| 4.5 | 4,500 | 7.875 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 13, 1986 | Jun 5, 1986 | Yes |
| 00 | Jun 12, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-33740 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-33740 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01333740, documented in the API reference.