WELL · 42-013-33931 · DISTRICT 1
Sutton Sussex E. Crown Flood Uni #15R
Atascosa County · Crown E. (Navarro) field · Vertical
Sutton Sussex E. Crown Flood Uni #15R (API 42-013-33931) is a plugged well in Atascosa County, plugged November 27, 2023, last operated by Roland Oil Company.
The RRC has issued one drilling permit, issued November 28, 1989, permitted to 4,800 ft.
It was permitted by Hollub, Lambert Drilling Company and has since transferred to Roland Oil Company on the wellbore schedule.
Completion filings report 2 formation tops, including Carrizo, Wilcox.
Its lease has reported 49.4K barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Hollub, Lambert Drilling Company; the EWA schedule now lists a different operator.
Charlotte, TX · P-5 Y, filed Jul 3, 2024 · (830) 570-5166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Roland Oil Company |
| Production reports | Roland Oil Companythrough Dec 2017 |
| Latest permit | Hollub, Lambert Drilling CompanyNov 28, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,800
- total depth, ft
- 1
- permits on file
- Nov 28, 1989
- last permit issued
- Mar 5, 1990
- completed
- 49.4K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 5, 1990
- Shut in
- —
- Plugged
- Nov 27, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sutton Sussex E. Crown Flood Uni O-1-3387 | Crown, E. (Navarro) | Roland Oil Company | 9 | 49.4K | 20 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollub, Lambert Drilling CompanyJan 1993 → Feb 1994
- 2Moxy Oil CompanyMar 1994 → Apr 2001
- 3Roland Oil CompanyMay 2001 → Dec 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 366824-99 | Drill | Hollub, Lambert Drilling Company | Nov 22, 1989 | Nov 28, 1989 | — | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-3387 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 532 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,615 | 4,635 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 501 | 12.25 | 248 S |
| 4.5 | 4,715 | 7.875 | 152 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 1990 | Apr 11, 1990 | Yes |
| 00 | Apr 17, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-33931 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-33931 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01333931, documented in the API reference.