WELL · 42-013-34031 · DISTRICT 1
Tom J.L. -a- Unit 2 #5
Atascosa County · Fashing (Edwards Lime -B-) field · Vertical
Tom J.L. -A- Unit 2 #5 (API 42-013-34031) is a well in Atascosa County operated by Enserch Exploration Inc, completed May 25, 1997.
The RRC has issued 2 drilling permits between 1994 and 1997, permitted to 11,000 ft.
Completion filings report 6 formation tops, including Del Rio, Georgetown, Edwards, Austin Chalk.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed Jan 5, 1998 · 984 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enserch Exploration Inc |
| Production reports | Capital Star Oil & Gas, Inc.through Apr 2026 |
| Latest permit | Enserch Exploration, IncMay 23, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 2
- permits on file
- May 23, 1997
- last permit issued
- May 25, 1997
- completed
- 0
- cumulative oil, bbl
- 294K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 25, 1997
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tom "a" GU 2 G-1-165121 | Fashing (Edwards Lime -A-) | Capital Star Oil & Gas, Inc. | 1 | 0 | 89.5K | Oct 1997 – Jul 2026 |
| Tom, J.L. -a- Unit 2 G-1-152859 | Fashing (Edwards Lime -B-) | Enserch Exploration, Inc | 1 | 0 | 205K | Jan 1995 – Oct 1997 |
Gas, mcf lease total
Last 12 months 36 · prior 12 36(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enserch Exploration, IncJan 1995 → Mar 1998
- 2Eex CorporationApr 1998 → Feb 2000
- 3Eex Operating, L.P.Mar 2000 → Jul 2003
- 4Capital Star Oil & Gas, Inc.Jan 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 461438-99 | Recompletion | Enserch Exploration, Inc | Apr 22, 1997 | May 23, 1997 | Sep 23, 1997 | 11,000 |
| 427989-99 | Drill | EP Operating Limited Partnership | Sep 13, 1994 | Oct 14, 1994 | Oct 31, 1994 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-152859 | — | — | — | — |
| — | — G-1-165121 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 364 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Del Rio | 10,070 | -9,706 |
| Georgetown | 10,100 | -9,736 |
| EdwardsEDWARDS LIME A | 10,270 | -9,906 |
| EdwardsEDWARDS LM. -A- | 10,270 | -9,906 |
| EdwardsEDWARDS LIME B | 10,523 | -10,159 |
| EdwardsEDWARDS LM. -B- | 10,523 | -10,159 |
| Austin Chalk | — | — |
| Buda | — | — |
| Eagle Ford | — | — |
| Eagle FordEAGLEFORD | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,271 | 10,290 | Perforated |
| 10,306 | 10,310 | Perforated |
| 10,340 | 10,346 | Perforated |
| 10,348 | 10,350 | Perforated |
| 10,548 | 10,558 | Perforated |
| 10,580 | 10,586 | Perforated |
| 10,686 | 10,692 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,230 | 12.25 | 490 S |
| 5.5 | 11,000 | 8.75 | 2,085 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 1997 | Oct 31, 1997 | Yes |
| 00 | Nov 7, 1997 | — | — |
| 00 | Aug 12, 1997 | Jun 30, 1997 | — |
| 00 | Mar 16, 1995 | Feb 10, 1995 | Yes |
| 00 | Feb 28, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-34031 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-34031 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01334031, documented in the API reference.