WELL · 42-013-34109 · DISTRICT 1
Steinle-Peeler Unit #1
Atascosa County · Jourdanton (Queen City) field · Vertical
Steinle-Peeler Unit #1 (API 42-013-34109) is a plugged well in Atascosa County, plugged September 24, 2013, last operated by Pullin Lease Service Inc..
The RRC has issued one drilling permit (amended once), issued December 12, 1997, permitted to 2,000 ft.
It was permitted by Harvey Brothers Oil & Gas and has since transferred to Pullin Lease Service Inc. on the wellbore schedule.
Its lease has reported 9.66K barrels of oil since April 1998, last reporting in February 2014. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Harvey Brothers Oil & Gas; the EWA schedule now lists a different operator.
Taft, TX · P-5 Y, filed May 4, 2026 · 21 permits on file · (361) 815-7415
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pullin Lease Service Inc. |
| Production reports | Pullin Lease Service, Inc.through Mar 2008 |
| Latest permit | Harvey Brothers Oil & GasDec 12, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 2
- permits on file
- Dec 12, 1997
- last permit issued
- Jan 14, 1998
- completed
- 9.66K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1998 THROUGH Feb 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 14, 1998
- Shut in
- —
- Plugged
- Sep 24, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Steinle-Peeler Unit O-1-14188 | Jourdanton (Queen City) | Pullin Lease Service, Inc. | 2 | 9.66K | 0 | Apr 1998 – Feb 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Harvey Brothers Oil & GasApr 1998 → Dec 1999
- 2Wallis Energy, Inc.Jan 2000 → Aug 2001
- 3Dorado Oil CompanySep 2001 → Jan 2002
- 4Pyle Petroleum, Inc.Feb 2002 → Sep 2002
- 5Pullin Lease Service, Inc.Oct 2002 → Mar 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471112-98 | Drill | Harvey Brothers Oil & Gas | Apr 15, 1998 | Dec 12, 1997 | Dec 31, 1997 | 1,562 |
| 471112-99 | Drill | Harvey Brothers Oil & Gas | Dec 11, 1997 | Dec 12, 1997 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14188 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 772 | 775 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 997 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 17, 1998 | Apr 13, 1998 | Yes |
| 00 | May 11, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-013-34109 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-013-34109 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Dec 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000090635 | H-1 Injection | Plugged Oct 3, 2013 | 200 | 250 | 772–780 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01334109, documented in the API reference.