WELL · 42-013-35302 · DISTRICT 1

Meeks SWD #1

WaterPlugged

Atascosa County · Fashing (Edwards Lime -B-) field  · Vertical

Meeks Swd #1 (API 42-013-35302) is a plugged well in Atascosa County, plugged October 26, 2021, last operated by Milestone Enviro Services LLC.

The RRC has issued one drilling permit, issued March 4, 2015, permitted to 6,950 ft.

It was permitted by Atascosa Disposal Well Svcs LLC and has since transferred to Milestone Enviro Services LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Queen City, Carrizo, Wilcox, Anacacho.

Operator of record

Milestone Enviro Services LLC

Permitted by Atascosa Disposal Well Svcs LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 4, 2025 · 8 permits on file · (832) 739-6700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMilestone Enviro Services LLC
Production reportsnone
Latest permitAtascosa Disposal Well Svcs LLCMar 4, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,950
total depth, ft
1
permits on file
Mar 4, 2015
last permit issued
Jul 1, 2015
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2015 THROUGH Apr 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 2015
Shut in
—
Plugged
Oct 26, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Meeks SWD O-1-18307Fashing (Edwards Lime -B-)Milestone Enviro Services, LLC100Apr 2015 – Apr 2022

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804182-99DrillAtascosa Disposal Well Svcs LLCFeb 26, 2015Mar 4, 2015Mar 20, 20156,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-18307————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Queen City2,800
Carrizo3,800
WilcoxWILCOX - DISPOSAL5,626
WilcoxWILCOX - DISPOSAL6,080
AnacachoANACACHO - H2S—
Austin ChalkAUSTIN CHALK - H2S, DISPOSAL—
Bartosh—
EscondidoESCONDIDO - H2S, DISPOSAL—
NavarroNAVARRO - H2S—
OlmosOLMOS - DISPOSAL—
Reklaw—

Perforations

Perforated and open-hole intervals.

FromToType
5,8045,828Perforated
5,8046,600Perforated
5,8285,848Perforated
5,9605,983Perforated
6,0226,047Perforated
6,2626,270Perforated
6,2746,284Perforated
6,5436,569Perforated
6,5796,600Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,96512.251,666 S
76,9758.75775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2020Nov 12, 2019—
00Nov 3, 2015Jul 22, 2015—
00Jul 2, 2015Jun 29, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.58M
bbl, all reported
Dec 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109277W-14 DisposalPlugged Mar 15, 202215,0002,8505,700–6,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01335302, documented in the API reference.