WELL · 42-015-00613 · DISTRICT 3
Phillips H. S. et al Gas Unit #1
Austin County · Nelsonville (10 000) field · Vertical
Phillips H. S. ET AL Gas Unit #1 (API 42-015-00613) is a plugged well in Austin County, plugged July 14, 1986, last operated by Falcon Seaboard Drlg. CO..
The RRC has issued 3 drilling permits between 1977 and 2004, permitted to 11,248 ft.
It was permitted by Magnum Producing & Operating CO. and has since transferred to Falcon Seaboard Drlg. CO. on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
Operator of record
Permitted by Magnum Producing & Operating Co.; the EWA schedule now lists a different operator.
Unknown, XX · P-5 Y
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Falcon Seaboard Drlg. Co. |
| Production reports | Magnum Producing, LPthrough Jan 2007 |
| Latest permit | Magnum Producing & Operating Co.Jan 8, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,248
- total depth, ft
- 3
- permits on file
- Jan 8, 2004
- last permit issued
- Apr 1, 1969
- completed
- 0
- cumulative oil, bbl
- 84.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2004 THROUGH Mar 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 1, 1969
- Shut in
- —
- Plugged
- Jul 14, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Phillips, H. S. G-3-203940 | Nelsonville (Wilcox 10,800) | Magnum Producing, LP | 1 | 0 | 84.9K | May 2004 – Mar 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing, LPMay 2004 → Jan 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540516-99 | Reenter | Magnum Producing & Operating Co. | Jan 8, 2004 | Jan 8, 2004 | — | 11,248 |
| 61976-99 | Other | Oleum Incorporated | Oct 17, 1979 | Oct 17, 1979 | — | 9,155 |
| 8915-99 | Recompletion | Oleum Incorporated | Sep 22, 1977 | Sep 22, 1977 | — | 11,248 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-203940 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 181 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,105 | 9,130 | Perforated |
| 10,002 | 10,008 | Perforated |
| 10,632 | 10,646 | Perforated |
| 10,776 | 10,796 | Perforated |
| 10,896 | 10,900 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,590 | 15 | 800 S |
| 2.375 | 8,989 | — | — |
| 2.375 | 9,070 | — | — |
| 5.5 | 11,246 | 8.75 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 16, 2004 | Sep 17, 2004 | Yes |
| 00 | Nov 1, 2004 | — | — |
| 00 | Jan 12, 1984 | Sep 13, 1979 | — |
| 00 | Jan 12, 1984 | Oct 11, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-015-00613 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-015-00613 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01500613, documented in the API reference.