WELL · 42-015-30279 · DISTRICT 3

Muench E. Gas Unit #1

Plugged

Austin County · New Ulm (Wilcox 10 600) field  · Vertical

Muench E. Gas Unit #1 (API 42-015-30279) is a plugged well in Austin County, plugged April 3, 1980, last operated by Dorchester Exploration Inc..

The RRC has issued 2 drilling permits between 1977 and 1978, permitted to 11,016 ft.

Operator of record

Dorchester Exploration Inc.

Houston, TX · P-5 Y, filed Feb 12, 1988 · 200 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDorchester Exploration Inc.
Production reportsnone
Latest permitDorchester Exploration, Inc.Feb 28, 1978
11,016
total depth, ft
2
permits on file
Feb 28, 1978
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 3, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
19124-99RecompletionDorchester Exploration, Inc.Feb 28, 1978Feb 28, 1978—11,016
228-99DrillDorchester Exploration, Inc.Jun 8, 1977Jun 8, 1977—11,016

Perforations

Perforated and open-hole intervals.

FromToType
9,3909,404Perforated
9,9099,929Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,15013.751,000 S
2.37510,572——
5.511,0168.375800 S
5.511,0168.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Feb 22, 1978—
00Jan 12, 1984Jun 6, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530279, documented in the API reference.