WELL · 42-015-30295 · DISTRICT 3

Lieberman #1

N

Austin County · Sealy (Wilcox 10 800) field  · Vertical

Lieberman #1 (API 42-015-30295) is a permitted well in Austin County filed by Magnum Producing, LP; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1978 and 2004, permitted to 13,500 ft.

It was permitted by Magnum Producing, LP and has since transferred to Ranger Holdings Company on the wellbore schedule.

Completion filings report 3 formation tops, including Yegua, Cook Mountain, Wilcox.

Operator of record

Ranger Holdings Company

Permitted by Magnum Producing, LP; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 15, 1987

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRanger Holdings Company
Production reportsMagnum Producing, LPthrough Mar 2026
Latest permitMagnum Producing, LPDec 14, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
4
permits on file
Dec 14, 2004
last permit issued
—
completed
0
cumulative oil, bbl
881K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lieberman G-3-210199Sealy (Wilcox Cons.)Magnum Producing, LP10620KJun 2005 – Jul 2026
Lieberman G-3-128230Sealy (Wilcox K)Magnum Producing, LP10262KJan 1993 – Dec 2015

Gas, mcf lease total

Last 12 months 1,937 · prior 12 27,897(-93%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Merit Energy CompanyJan 1993 → Jun 1994
  2. 2Tide West Oil CompanyJul 1994 → May 1996
  3. 3HS Resources, Inc.Jun 1996 → Aug 1998
  4. 4Questar Expl. and Prod. Co.Sep 1998 → Sep 2002
  5. 5Magnum Producing & Operating Co.Oct 2002 → Jan 2004
  6. 6Magnum Producing, LPFeb 2004 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554837-99RecompletionMagnum Producing, LPDec 14, 2004Dec 14, 2004—13,500
346027-99RecompletionAmpolex (Texas) Inc.May 3, 1988May 9, 1988—12,000
176925-99RecompletionRanger Oil CompanyNov 9, 1982Nov 9, 1982—12,000
22590-99DrillRanger Oil CompanyApr 20, 1978Apr 20, 1978—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-128230————
—— G-3-210199————

Formation tops

As filed on W-2/G-1. Subsea from 200 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP OF YEGUA5,470-5,270
Cook MountainTOP OF COOK MOUNTAIN6,750-6,550
WilcoxTOP OF WILCOX8,943-8,743
WilcoxWILCOX K9,960-9,760
WilcoxWILCOX M-210,402-10,202

Perforations

Perforated and open-hole intervals.

FromToType
9,9639,976Perforated
10,38610,421Perforated
10,75610,786Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,47114.751,300 S
2.37510,300——
5.512,0018.751,555 S
5.512,0148.751,555 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2005Jul 25, 2005Yes
00Aug 24, 2005——
00Sep 28, 1988Jul 18, 1988Yes
00Sep 10, 1988——
00Jan 12, 1984Sep 15, 1982—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530295, documented in the API reference.