WELL · 42-015-30471 · DISTRICT 3

Butler Ranch #4

Plugged

Austin County · New Ulm (10400) field  · Vertical

Butler Ranch #4 (API 42-015-30471) is a plugged well in Austin County, plugged September 1, 1987, last operated by Samson Resources Company.

The RRC has issued 2 drilling permits between 1981 and 1985, permitted to 10,700 ft.

Completion filings report 3 formation tops, including Yegua, Cook Mtn, Wilcox.

Operator of record

Samson Resources Company

Tulsa, OK · P-5 Y, filed Jul 13, 2001 · 230 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSamson Resources Company
Production reportsnone
Latest permitSamson Resources CompanyNov 6, 1985
10,700
total depth, ft
2
permits on file
Nov 6, 1985
last permit issued
Nov 29, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 29, 1985
Shut in
—
Plugged
Sep 1, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
290110-99RecompletionSamson Resources CompanyNov 1, 1985Nov 6, 1985—10,484
105424-99DrillAmax Petroleum CorporationJan 13, 1981Jan 13, 1981—10,700

Formation tops

As filed on W-2/G-1. Subsea from 427 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua3,740-3,313
Cook MTN5,030-4,603
Wilcox7,010-6,583
WilcoxMIDDLE WILCOX8,340-7,913
WilcoxLOWER WILCOX10,033-9,606

Perforations

Perforated and open-hole intervals.

FromToType
9,6159,625Perforated
10,38610,394Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,84813.51,300 S
2.3759,392——
4.510,4848.75700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 1986Dec 27, 1985Yes
00Jan 24, 1986——
00Jan 12, 1984Mar 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530471, documented in the API reference.