WELL · 42-015-30485 · DISTRICT 3
Waterflood Unit #1 #61
Austin County · Vertical
Waterflood Unit #1 #61 (API 42-015-30485) is a former disposal or injection well in Austin County, last operated by Enhanced Energy Partners Corp; its UIC permit is no longer active.
The RRC has issued 6 drilling permits between 1981 and 2008, permitted to 4,700 ft.
Completion filings report 2 formation tops, including Gutowsky, Grawunder.
Its 2 leases have reported 1.6M barrels of oil and 242K mcf of gas since January 1993, last reporting in July 2026. The leases carry 77 wells, so these are lease totals, not this well alone.
Operator of record
Tomball, TX · P-5 Y, filed Oct 4, 2025 · 172 permits on file · (281) 744-3936
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Enhanced Energy Partners Corpthrough Apr 2026 |
| Latest permit | Enhanced Energy Partners CorpOct 15, 2008 |
- 4,700
- total depth, ft
- 6
- permits on file
- Oct 15, 2008
- last permit issued
- —
- completed
- 1.6M
- cumulative oil, bbl
- 242K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 77 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waterflood Unit #1 O-3-8909 | Raccoon Bend (Jackson) | Enhanced Energy Partners Corp | 77 | 1.6M | 242K | Jan 1993 – Jul 2026 |
| — O-3-18642 | — | — | 0 | 0 | 0 | — |
Oil, barrels lease total
Last 12 months 35,536 · prior 12 25,090(+42%)
Gas, mcf lease total
Last 12 months 5,413 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Apr 1999
- 2Future Petroleum CorporationMay 1999 → Jul 1999
- 3Bargo Energy CompanyAug 1999 → May 2001
- 4Mission Resources CorporationJun 2001 → Nov 2003
- 5T-N-T Engineering, Inc.Dec 2003 → Sep 2007
- 6Enhanced Energy Partners CorpOct 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 664593-99 | Recompletion | Enhanced Energy Partners Corp | Jun 16, 2008 | Oct 15, 2008 | Feb 14, 2008 | 3,291 |
| 362418-99 | Recompletion | Exxon Corp. | Aug 7, 1989 | Aug 8, 1989 | — | 4,200 |
| 346727-99 | Recompletion | Exxon Corp. | May 19, 1988 | Jun 14, 1988 | — | 4,200 |
| 274845-99 | Recompletion | Exxon Corp. | Feb 27, 1985 | May 10, 1985 | — | 4,200 |
| 274841-99 | Recompletion | Exxon Corp. | Feb 27, 1985 | May 10, 1985 | — | 4,200 |
| 124372-99 | Drill | Exxon Corp. | May 28, 1981 | May 28, 1981 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-8909 | — | — | — | — |
| — | — O-3-8909 | — | — | — | — |
| — | — O-3-18642 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 163 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gutowsky | 3,119 | -2,956 |
| Gutowsky | 3,266 | -3,103 |
| Grawunder | 3,448 | -3,285 |
| Grawunder | 3,541 | -3,378 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,773 | 1,782 | Perforated |
| 3,120 | 3,146 | Perforated |
| 3,195 | 3,205 | Perforated |
| 3,242 | 3,250 | Perforated |
| 3,266 | 3,276 | Perforated |
| 3,335 | 3,370 | Perforated |
| 3,541 | 3,569 | Perforated |
| 3,577 | 3,589 | Perforated |
| 3,808 | 3,814 | Perforated |
| 3,912 | 3,917 | Perforated |
| 3,925 | 3,928 | Perforated |
| 3,925 | 3,939 | Perforated |
| 3,932 | 3,939 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 317 | 17.5 | 360 S |
| 10.75 | 319 | 17.5 | 360 S |
| 9.875 | 1,273 | — | 650 S |
| 8.625 | 1,514 | 10.625 | 671 S |
| 8.625 | 1,525 | 10.625 | 671 S |
| 2.375 | 3,848 | — | — |
| 5.5 | 4,192 | — | 415 S |
| 5.5 | 4,196 | 7.875 | 230 S |
| 5.5 | 4,227 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 2011 | Oct 6, 2010 | — |
| 00 | Dec 10, 2010 | Jan 21, 1992 | — |
| 00 | Feb 7, 1992 | Jan 21, 1992 | — |
| 00 | Dec 17, 1990 | Aug 10, 1990 | — |
| 00 | Aug 25, 1990 | Oct 22, 1984 | — |
| 00 | Oct 14, 1988 | Sep 15, 1988 | Yes |
| 00 | May 22, 1986 | Apr 28, 1986 | Yes |
| 00 | Jul 29, 1985 | Jun 28, 1985 | — |
| 00 | Jul 18, 1985 | — | — |
| 00 | Jan 28, 1985 | Jan 14, 1985 | — |
| 00 | Jan 12, 1984 | Feb 16, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-015-30485 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-015-30485 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.23M
- bbl, all reported
- Jul 2011
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000071145 | H-1 Injection | Canceled Apr 27, 2012 | 2,000 | 1,100 | 3,350–3,650 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01530485, documented in the API reference.