WELL · 42-015-30501 · DISTRICT 3

Hardy, R. #1

Plugged

Austin County  · Vertical

Hardy, R. #1 (API 42-015-30501) is a plugged well in Austin County, plugged November 22, 1981, last operated by Cardinal Well Service Inc..

The RRC has issued 2 drilling permits between 1981 and 1983, permitted to 3,500 ft.

Operator of record

Cardinal Well Service Inc.

Conroe, TX · P-5 Y, filed Nov 3, 2000 · 4 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCardinal Well Service Inc.Apr 25, 1983
3,500
total depth, ft
2
permits on file
Apr 25, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 22, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
192724-99OtherCardinal Well Service Inc.Apr 25, 1983Apr 25, 1983—3,500
139546-99DrillAgoil, Inc.Oct 30, 1981Oct 30, 1981Nov 8, 19812,127

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530501, documented in the API reference.