WELL · 42-015-30732 · DISTRICT 3
Williams Creek #1H
Austin County · Giddings (Austin Chalk Gas) field · Horizontal
Williams Creek #1H (API 42-015-30732) is a plugged horizontal well in Austin County, plugged June 28, 2010, last operated by Chesapeake Operating Inc..
The RRC has issued one drilling permit (amended once), issued April 19, 1999, permitted to 16,500 ft.
Completion filings report one formation top, including Austin Chalk.
Operator of record
Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Jun 2009 |
| Latest permit | Chesapeake Operating, Inc.Apr 19, 1999 |
- 16,500
- total depth, ft
- 2
- permits on file
- Apr 19, 1999
- last permit issued
- Aug 24, 1999
- completed
- 0
- cumulative oil, bbl
- 49.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Jun 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 24, 1999
- Shut in
- —
- Plugged
- Jun 28, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams Creek G-3-176223 | Giddings (Austin Chalk, Gas) | Chesapeake Operating, Inc. | 1 | 0 | 49.5K | Aug 1999 – Jun 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Aug 1999 → Jun 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483930-98 | Drill | Chesapeake Operating, Inc. | Feb 17, 2000 | Apr 19, 1999 | May 3, 1999 | 16,500 |
| 483930-99 | Drill | Chesapeake Operating, Inc. | Apr 19, 1999 | Apr 19, 1999 | — | 16,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-176223 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 368 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkAUSTIN CHALK(TOP) | 15,348 | -14,980 |
| Austin ChalkAUSTIN CHALK (TOP) | 15,494 | -15,126 |
| Austin ChalkAUSTIN CHALK (BASE) | 15,713 | -15,345 |
| Austin ChalkAUSTIN CHALK (BASE) | 15,859 | -15,491 |
| Austin ChalkAUSTIN CHALK, (BASE) | 15,859 | -15,491 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,505 | 19,250 | Perforated |
| 15,508 | 19,250 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,600 | 17.5 | 1,560 S |
| 9.625 | 12,505 | 12.25 | 1,120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 2000 | May 10, 2000 | — |
| 00 | May 26, 2000 | May 8, 2000 | — |
| 00 | Apr 7, 2000 | Oct 11, 1999 | Yes |
| 00 | Mar 28, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-015-30732 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-015-30732 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01530732, documented in the API reference.